Scope of Work The work includes the supply and installation of sewer, watermains, water valves, roadway, curb and sidewalk reconstruction along Rymal Road East from Trinity Church Road to 300m east of Fletcher Rd.
Staging of Work will be as follows: – Stage 1A – Rymal Rd – Trinity Church Rd to Dakota Blvd – construct south limit of road including all underground works and reconstruct Rymal Rd to base asphalt.
– Stage 1B – Rymal Rd – Trinity church Rd to Dakota Blvd – construct north limit of road including all underground works and reconstruct Rymal Rd to base asphalt.
– Stage 2A – Rymal Rd – Dakota Blvd to 300 m East of Fletcher Rd – construct South limit of road including all underground works and reconstruct Rymal Rd to base asphalt.
– Stage 2B – Rymal Rd – Dakota Blvd to 300m East of Fletcher Rd – construct north limit of road including all underground works and reconstruct Rymal Rd to base asphalt.
Stages 1 – 2 have commenced and it’s anticipated to be completed by the end of November, 2015 weather permitting.
These works involve the installation of concrete box culverts, catch basins, concrete curbs and sidewalks. During this time you may experience some inconveniences such as noise, dust, temporary water disruption of water service and restricted traffic movement. Every effort will be made to do the work in a timely manner and to keep any inconvenience to a minimum. We ask for your patience during this period.
For further information on this project, the staff contacts are:
Construction Technician, Hazel Rodrigues, 905-546-2424, ext 2438 Project Manager, Dennis Perusin, 905-546-2424, ext 2613 General Construction Section, 905-546-4313