top of page
marktadeson

Woodburn Road Bridge

Municipal Class Environmental Assessment (EA)

Notice of Study Commencement and Phase 1 & 2 Report

THE STUDY

The Woodburn Road Bridge, spanning Twenty Mile Creek (between Golf Club & Guyatt Rd’s) is in need of a potential replacement.

THE PROCESS & PUBLIC CONSULTATION

The bridge improvements are being planned as a Schedule B (Phase 1 & 2) Municipal Class EA under the auspices of the Municipal Engineers Association Class Environmental Assessment (EA) – October 2000, as amended 2007 and 2011.

A Phase 1 & 2 Report, highlighting the alternatives considered and the evaluation process to identify a preliminary preferred alternative will be available for public review and comment. The Phase 1 & 2 Report will be available online, www.hamilton.ca/woodburnbridgeea.

The alternatives considered include bridge removal, replacement, rehabilitation, and “do nothing”. Each alternative will have varied impacts on traffic, cost, Twenty Mile Creek, safety, etc. The preliminary preferred alternative is bridge replacement.

Hard copies of the Phase 1 & 2 Report will be available at the following locations:

  1. City Hall Clerk’s Dept.: 71 Main St. E.; 8:30 a.m. – 4:30 p.m.

  2. City Centre: 77 James St. N. Suite 400; 8:30 a.m. – 4:30 p.m.

  3. Binbrook Library: 2641 Highway 56 Binbrook, ON.; For hours of operation please call 905-692-3323, or visit http://www.hpl.ca/branches/binbrook-branch

1 view0 comments

Recent Posts

See All

コメント


bottom of page